2015 Cyr Creek, Black River, and Red Lake River Sub-Watersheds Water Quality Improvement Projects

Project Details by Fiscal Year
2015 Fiscal Year Funding Amount
$277,500
Fund Source
Clean Water Fund
Recipient
Red Lake SWCD
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
March 2015
End Date
December 2018
Activity Type
Grants/Contracts
Counties Affected
Red Lake
Red Lake
Project Overview

Red Lake County Soil and Water Conservation District (SWCD) has targeted water quality improvement projects to twelve sites in the Black River, Cyr Creek, and Red Lake River Sub-Watersheds of the Red Lake River Watershed. Data analysis obtained from a variety of models identified which sub-watersheds were contributing to impairments, highlighted which fields in those sub-watersheds were contributing the most sediment, and even showed specific locations in the field which were most vulnerable to erosion. Red Lake County SWCD also conducted an Erosion Site Inventory in 2014, which verified the information from the tools/models, and found landowners in these priority areas that were eager to fix the erosion problems on their fields. Water Quality Improvement Projects, which include but are not limited to, grade stabilization structures, grassed waterways, and water & sediment basins, will be the Best Management Practices implemented to correct the erosion that is occurring at these site locations. The twelve proposed installed practices result in the following soil loss reductions numbers: Sediment (TSS) will be 594.30 tons per year, Soil (estimated savings) will be 2,237 tons per year and Phosphorus (est. reduction) will be 693.44 pounds per year.

Competitive Grant Making Body
Board Members and Qualifications

See http://www.bwsr.state.mn.us/aboutbwsr/index.html and http://www.bwsr.state.mn.us/aboutbwsr/boarddirectory.pdf

Advisory Group Members and Qualifications

See http://www.bwsr.state.mn.us/aboutbwsr/index.html

Conflict of Interest Contact

Nicole Clapp

Legal Citation / Subdivision
Laws of Minnesota 2013, Regular Session chapter 137
2015 Fiscal Year Funding Amount
$277,500
Other Funds Leveraged
$69,375
Direct expenses
$277,500
Administration costs
$3,264
Number of full time equivalents funded
0.52
Proposed Measurable Outcome(s)

Targeting priority reaches to the Red River, this project will include but is not limited to installing grade stabilization structures, grassed waterways, and water and sediment basins to correct the erosion that is occurring. The twelve proposed practices are estimated to result in a sediment reduction of 590 tons per year and a phosphorus reduction of 690 pounds per year.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Red Lake SWCD are: David Bachand, David Miller, Linda Mickelson, Mark Lacrosse, Orville Knott
Project Manager
First Name
Tanya
Last Name
Hanson
Organization Name
Red Lake SWCD
Street Address
2602 Wheat Dr
City
Red Lake Falls
State
MN
Zip Code
56750
Phone
218-253-2593 x111
Email
tanya.hanson@mn.nacdnet.net
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767