Supplement existing Design/Engineering services to complete site improvement plans for fishing nodes, trails, landscape, site amenities and signage. Construction activities will include demolition, grading, stormwater management, utilities, construction, landscaping, installation of signs and site amenities. Legacy funds will leverage non-state funds provided by Vadnais Lake Area Water Management Organization and Saint Paul Regional Watershed.
Design of internal pathways to park facilities located between Cherokee Heights Blvd. and Chippewa Ave. Project includes internal design services, consultant and engineering fees, surveying, and soil analysis.
Construction of internal pathways to park facilities located between Cherokee Heights Blvd and Chippewa Ave. Project may include surveying, soil analysis, temporary site controls, demolition of asphalt and concrete, tree relocation, excavation, grading, stormwater management, erosion control, paving, concrete work, retaining wall, signage, striping, and landscaping.
Design of internal pathways to park facilities located between Cherokee Heights Blvd. and Chippewa Ave. Project includes internal design services, consultant and engineering fees, surveying, and soil analysis.
Installation of ornamental pedestrian-scale lighting along the Ohio Street trail in Cherokee Heights Regional Park, including wiring and any other associated utility and equipment installation
to construct 1.3 miles of a bituminous trail connecting Cherokee Regional Park to Harriet Island/Lilydale Regional Park, including site enhancements along the trail such as a retaining wall, fence, landscaping, parking, scenic overlooks, benches, drinking
Completion of the activities in the previously-funded project. The project will result in the construction of an approximately 7200 s.f. maintenance shop and administrative office, replacing an existing inadequate facility. Project activities include demolition, design, engineering, construction, construction administration and other related construction costs
In cooperation with the City of St. Paul, update the joint Master Plan for Phalen-Keller Regional Park. ?The updated master plan will identify and prioritize future capital projects for the regional park that will enhance visitor services.
Prepare a master plan update for Como Regional Park with particular focus on the trial network around Como Lake and connection to Grand Round North Regional Trail. Work may include community engagement, assessing feasibility, engineering testing, and transportation study and analysis.
Como shuttle program relieves pressure on parking availability by providing additional parking capacity and increasing accessibility to regional park programs and experiences.
Como shuttle program relieves pressure on parking availability by providing additional parking capacity and increasing accessibility to regional park programs and experiences
Full reconstruction of parking lots and associated entrance drives, path connections, and curbs into Como Regional Park, including asphalt and concrete removal, excavation, grading, stormwater management, erosion control, paving and concrete work, lighting, and landscaping
to install solar thermal hot water heating system for the bathhouse building and the concessions building as part of the park swimming pool replacement
Rice Creek Chain of Lakes Park Reserve, complete reconstruction of campground roadways, utility improvements and campsites. (3 of 6 projects financed with grant.)
Contract with Minnesota Conservation Corps to complete native plantings, shoreline restoration, and invasive plant control. Additional crews will enhance resource preservation and restoration program, limiting invasive growth and protect vital resource areas.
At Lilydale Regional Park, completion of construction work started in 2009 with a FY 2010 Parks and Trails Fund Grant and new design/engineering/construction documents for picnic shelter, lake picnic area and middle section road re-alignment including utilities and lighting.
Lake Elmo Park Reserve. Complete Winter Recreation Area development that was started with FY 2010 Parks and Trails Fund grant including: plan winter recreation area project, develop or re-develop recreation facilities to accommodate evening use, install lighting for ski trails and site, develop roads and parking lot, remodel or replace barn for use as a trailhead, and provide signage and other amenities to enhance park visitor's experience
At Bald Eagle-Otter Lakes Regional Park, complete 2 acre Nature Play Area and 1 acre Children's Garden (including garden house for multi-purpose programs) at Tamarack Nature Center that was started with the FY 2010 Parks and Trails Fund grant and other funds.
Complete important Como RP access road, Estabrook Drive, and related infrastructure, lighting, landscape restoration. Park hosts approximately 4,476,000 visits annually, representing people from many backgrounds.
Final stages of implementation of the first-in-the-nation public natural filtration swimming pool at Webber Park, which is within North Mississippi Regional Park. Work will include design, engineering, and construction of landscaping, stormwater management, grading and drainage, furniture, and signage.
Central Mississippi Riverfront Regional Park, Above the Falls Regional Park. Conduct a design competition to develop a next generation park master plan for the Minneapolis Riverfront Regional Parks at an estimated cost of $350,000. And complete initial planning and engineering documents for restoration and development of the Mill Ruins Park Headrace facilities in Central Mississippi Riverfront Regional Park at an estimated cost of $212,000. MRPB staff will be working with the Met Council staff to update this scope of service, with confirmation of the scope change in July 2011.
Connecting People to the Outdoors - A Parks and Trails Strategic Objective is a program area representing DNR's commitment to one of the four pillars identified in the 25 year Legacy plan. The Legacy plan identifies its purpose to better develop Minnesota's stewards of tomorrow through efforts to increase life-long participation in parks and trails. The purpose of this program is to call attention to the pillar, but also to centralize and streamline reporting on other related programs within the pillar.
Contract with CCM for natural resource and maintenance management throughout the regional park system in Anoka County. Work includes conducting invasive species removals, prairie, oak savanna and forest restoration, oak wilt management, seeding, plantings, building and grounds maintenance, tree/shrub removal, debris removal, sign installation, river clean-up/obstruction removal, if needed.
The Conservation Corps provides a crew to perform natural resource management tasks throughout the regional park system. Buckthorn removal, community garden maintenance, invasive species control, and landscaping are some of the tasks performed
The Division of Parks and Trails (as directed by Chapter 172, Art. 3, Sec. 2, Subd. 3(c)) utilizes Conservation Corps of Minnesota services for restoration, maintenance, and other activities that supplement the ability to reach Legacy Fund goals. Budget associated with this program area capture an accounting of dollars that support CCM Summer Youth, Individual Placements, and special projects for park and trail renewal and development. Other dollars not accounted for in this program area are part of other PAT program areas and included as part of those budgets.
The purpose of this program is to conduct additional requested conservation education programs for school and other groups. This program expands the reach of conservation education to local communities.
Lake Elmo Park Reserve. Construct trailhead building at winter recreation area, construct new well, septic, site lighting, trails, parking, and related infrastructure, landscaping and amenities.
Theodore Wirth Regional Park, St. Anthony Parkway Regional Trail, Minnehaha Regional Park, construct loop trail around Wirth Lake, reconstruct wetland, parking, and update stormwater and buildings.