Lake Elmo Park Reserve. Build Winter Recreation Area including plan winter recreation area, develop recreation facilities to accommodate evening use; install lighting for ski trails and site; develop roads and parking lot; remodel barn for use as a trailhead. A?
Central Mississippi Riverfront Regional Park, redevelop Boom Island & BF Nelson picnic area, including playground replacement, bike and pedestrian trails, wading pool. Central Mississippi Riverfront Regional Park, develop master plan. Central Mississippi Riverfront Regional Park, construct playground. A?
Crosby Farm Regional Park. Develop new east side entrance and parking area. Build new trail connections to Sam Morgan Regional Trail and other existing trails. Convert unused road bed to green space.
Minneapolis Chain of Lakes Regional Park, implement Brownie Lake Master Plan, develop a 1-mile trail and update lighting, vegetation, and drainage. Upgrade fishing facility, archery area.
At Bald Eagle-Otter Tail Lakes Regional Park, develop a volunteer corps of nature play leaders, gardeners and naturalists to support nature programming.
Develop a mountain bike trail master plan and initiate implementation of mountain bike trail improvements consistent with the master plan. ( There were 761,900 visits to Battle Creek Regional Park in 2013).
Create a master plan for Minnehaha Parkway Regional Trail through extensive engagement with the community. Create a new master plan to provide direction for connecting more people to parks through future capital investment, and promote the park through its community engagement.
Develop and implement nature and outdoor recreation programming for people of color and lower income levels throughout Ramsey County Regional Parks and Trails system.
Develop and implement nature and outdoor recreation programming for people of color and lower income levels throughout Ramsey County Regional Parks and Trails system.
Design & engineering for final trail construction from Buerkle Road to Highway 96 including design & engineering for trails, sidewalk, storm water management, wetland impacts, landscape, signage, pedestrian bridge, site amenities; and design/engineering for preliminary trail extension plans between Highway 96 to County Road J consisting of design/engineering for trail alignment, amenities, conceptual pedestrian bridge, grading, landscaping, stormwater management, and signage; and prepare a master plan amendment for the Bruce Vento Regional Trail including design/engineering, commun
The commissioner shall develop a ten-year strategic state parks and trails plan considering traditional funding and the funding available under the Minnesota Constitution, article XI, section 15. The plan shall incorporate the 25-year framework developed by the University of Minnesota Center for Changing Landscapes. (HF 1231, Art 3, Sec 2)
This program provides critical assistance to MN DNR Parks and Trails Division Regional and District offices to assist with renewal and rehabilitation efforts prioritized locally by field staff. Projects include the following types: State Park Building and Facilities Emergency Repair and Maintenance, Paved Trail Maintenance and Asset Preservation, and State Park and State Forest Trail Renewal. This project is a newly reorganized budget area that consolidates these three smaller project areas reported on in previous years.
This project replaced bridge #4 on the Douglas State Trail. A grant from the Federal Recreation Trail Program contributed funding towards this project, and leveraged the Legacy funding.
to construct 30 miles of beginner/intermediate natural surface singletrack trail purpose built for mountain biking at Lester Park, Mission Creek, Piedmont, and Brewer Park areas of Duluth
to construct a multi-use path forming a continuous, regional path between Viola Road Trail and Towne Club Road Trail, with interconnection to Quarry Hill Nature Center and future connection to Chester Regional Trail
Prepare master plan amendment for Eastside Heritage Park portion of Bruce Vento Regional Trail. Project may include community engagement, assessing feasibility, and engineering testing.
The Parks and Trails Division is creating innovative programs to attract new audiences to Minnesota state parks and trails. Skill-building programs, such as "I Can Camp!," provide a trial opportunity by eliminating the barriers of needing to have pre-existing knowledge or gear for the activity.
to construct a solar powered potable water supply which will consist of a potable water supply well, solar pump and DC motor, on-site solar panel mounted to an adjacent frame and to the batteries used to power the pump motor with a user on/off switch at w
to construct a new sustainable single track trail in the Elm Creek Park Reserve for mountain bikers, hikers, trail runners and snowshoers that has two difficulty levels