Mesic Maple-Basswood Forest Protection Project

Project Details by Fiscal Year
2011 Fiscal Year Funding Amount
$225,805
Fund Source
Outdoor Heritage Fund
Recipient
Redwood SWCD
Status
Completed
Start Date
February 2011
End Date
June 2014
Counties Affected
Redwood
Redwood
Project Overview
The existing water control structure at the outlet of 119 acre Mud Lake (#47-31P) is severely corroded and in danger of washing out. If this CPL grant application is successful the structure will be replaced with a new one, consisting of non-corrosive High Density Polyethylene (HDPE) material. Project site is private lands but all necessary easements are held by State of Minnesota. Mud Lake is adjacent to a federal Waterfowl Production Area and provides important shallow lake habitat for waterfowl, other migratory birds, and resident wildlife.
2011 Fiscal Year Funding Amount
$225,805