This project saw the electrification of 20 campsites in Cascade State Park. RV camping is extremely popular, and the North Shore has very few electrified campsites within our state park system. These new electric sites satisfy some of the incredible demand for this amenity.
Ramsey-Washington Metro Watershed District (RWMWD) will improve water quality in Casey Lake and ultimately Kohlman Lake through the installation of approximately 25 rain gardens on priority properties identified as part of the Casey Lake Urban Stormwater Retrofit Assessment completed by Ramsey Conservation District (RCD) in 2011.
To remodel an existing commercial building to be established as the Pillager Arts Center. The Pillager Arts Center will be an epicenter for arts education for the community and serve as a space where people can interact with other creative minds.
To update and enhance cultural heritage exhibits at the Cass County Fair. Projects will include brightening display areas, installing speakers, and removing outdated displays to replace with new exhibits of art and cultural artifacts from the Leech Lake Band of Ojibwa and other pieces relating to regional heritage.
This 3-part project is developing and installing shoreline buffer projects on Ten Mile Lake, and the Roosevelt, Lawrence, Leavitt Lake area (RALALA).An additional part will correct roadway erosion contributing to sedimentation and water quality degradation on Buxton Road between McKeowen and Mann Lakes. Woodrow Township will work with Cass County SWCD/ESD and adjacent landowners to construct sedimentation basins and rain gardens and restructure the roadbed by reducing the slope to eliminate erosion and sedimentation.
This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.
This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.
To hire qualified professionals to catalog hundreds of books in the Minnesota Genealogical Society's collections, to allow greater access to these resources.
Preservation of a historically important collection of photographs, taken for the purposes of insurance underwriting in the mid-1950's, was the goal of this project. Appropriate storage was researched and determined. Archival grade sleeves and storage boxes were obtained. An inventory of all photographs was performed, cataloged and entered into a professional software database. Digital imaging of the original photographic prints provides researchers with a sustainable alternative to viewing the prints.
To fully catalog the museum's inventoried collection that documents the history of art in Minnesota under the direction of a qualified museum registrar.
Crow Wing SWCD is building off its success with Project Recharge and expanded the program to target Gull and Big Trout lakes. The SWCD selected these two lakes because of their declining transparency readings, 25 interested landowners, 2 adjacent resorts, and the community support, past partnerships, valuable fisheries, high ratio of forested land, and low ratio of impervious area in the lakeshed.The SWCD worked with partners to find willing landowners and businesses to complete the following types of projects:Swap Rock for Native Stock: Implement bioengineering to stabilize shorelines.
To hire a qualified consultant to develop a Historic Structure Report that will help preserve the Cathedral of Our Merciful Savior and Guild Hall, listed in the National Register of Historic Places.
To hire consultants to measure feasibility of publicly-desired operational models for its facility as an arts and community center, listed in the National Register of Historic Places. Federal ID 41-184644
To hire a qualified architect to prepare a conditions assessment and planning documents for the Cathedral of the Immaculate Conception, proposed to be used as a community center, and listed in the National Register of Historic Places.
On many public lands in northwest Minnesota, cattail growth has far exceeded the distribution recommended for optimum wetland wildlife habitat and a need for cattail control has become recognized. Cattails have also recently been demonstrated to have bioenergy potential.
CCWMO will oversee four separate feasibility studies with the goal of producing plan sets and cost estimates for future projects, as well as writing a feasibility study that meets all BWSR requirements for the management of carp.
The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures.